SEWER RATE SCHEDULE
Effective July 1, 2011

| Up to 1,000 gallons
(Base Rate) |
$ 19.10 |
| Up to 2,000 gallons |
$ 20.60 |
| Up to 3,000 gallons |
$ 21.47 |
| Up to 4,000 gallons |
$ 22.29 |
| All over 4,000 gallons |
$ 5.61 per 1,000
gallons |
Flat rate - no water
meter
(Residential only) |
$ 29.61 |
| Residuals Management
Fee |
$ 2.78 per 4,200
gallons |
| Returned check fee |
$ 30.00 |
| Late bill payment fee |
$ 2.00 |
| No Bill charge |
$ 2.00 |
| |
|

Tap fee (on same side of
road): $ 1082.00
or Cost of Installation

Monitored Industrial Rate
| Industrial rate |
$
6.62 per 1,000 gallons |
| Industrial Permitting Fee |
$ 1,200.00 per Industrial Permit |

Surcharge Rate
(above 250 ppm)
| Biochemical oxygen demand |
$ 0.46 per pound |
| Total suspended solids |
$ 0.46 per pound |
| Residual Management Fee |
$ 2.70 per 4200 gallons
$ 0.12 per pound BOD |
| Ammonia (above 25 ppm.) |
$ 1.63 per pound |

Septic Tank Hauling
Monthly Rates
| 30,000 Gals. Monthly Disposal (Base
Rate) |
$ 325.00 |
| Each 1,000 Gals. over 30,000 |
$ 10.85 |
| Expired Permit Renewal |
$ 486.70 |
| |
|
The first Permit issued will be free. If permit is
allowed to expire and another must be issued within a 12-month period, the
charge will be 1.5 times the base rate of $325.00 per month.

Capital Projects Fee
(monthly charge based on meter size)
| Less than 2" |
$1.50 |
6" |
$ 9.00 |
| 2" |
$3.00 |
8" |
$12.00 |
| 3" |
$4.50 |
10" |
$15.00 |
| 4" |
$6.00 |
|
|
|