We are pleased to report that this
project is NOW nearing completion.
The water tank and lines are completed
and in service.

The 750,000 gallon elevated water
tank is located on 2.25 Acres in Richburg, South Carolina on SC Highway 901.
This project includes 3,850 linear
feet of 12 inch DIP water line, 3,600 linear feet of 16" DIP water line, an
800 gallons per minute duplex pump station, and 9 fire hydrants.
Please see pictures below of some of
the stages of the construction.

Richburg Water Tank Project Update As of
December 10th
Construction is underway on the 750,000 gallon
elevated water tank located on 2.25 Acres in Richburg, South Carolina on SC
Highway 901.
This project will include 3,850 linear feet of 12
inch DIP water line, 3,600 linear feet of 16" DIP water line, an 800 gallons
per minute duplex pump station, and 9 fire hydrants.
The contract was awarded to Phoenix Fabricators &
Erectors, Inc of Cincinnati, Ohio as the low bidder.
Construction is scheduled to be completed in June
2003.
Please see pictures below for progress of the tank
project.

Pictures of the progress of construction:
(Click on pictures to see larger view)
As of October 9, 2002

Construction of foundation and vault for the inlet valve, outlet valve, and
water line.
Main water line inlet valve.
As of December 6, 2002